High Performance Fabric Building Work
The client contracted CWC to assemble and erect 2 55’ high prefabricated steel buildings that were clad with a high performance weather and wind resistant fabric. CWC designed the projects so that the buildings were securely anchored to 40’ containers filled with ecology blocks so as to allow for future dismantling and moving.
click thumbnails to enlarge photos